What is the “Stage 3” project?

The short answer: the public records checked so far do not establish a current Couran Cove proposal officially named “Stage 3.” They do reveal an earlier staged development and a separately identified future development area. Those are not automatically the same thing.

Last source check 31 July 2026Research continuing
OUR CURRENT FINDING

“Stage 3” should be treated as an unverified working label unless it can be tied to a development-application number, lot and plan, applicant, dated proposal and official decision record.

Island history contains overlapping approvals, community-title documents, precinct plans, leases, infrastructure arrangements and later proposals. A familiar name used in conversation may not be the legal name of a project.

What the verified record does show

1997: the government project register called the resort a staged project

Queensland’s 1997–98 Projects Queensland register listed Couran Cove Resort as a $150 million development by Interpacific Resorts (Australia) Pty Ltd. It said completion of Stage 1 was scheduled for January 1998 and described marine resort apartments, waterfront villas, island forest retreats, health, sport, training, meeting and conference facilities.

That record proves that “Stage 1” was used at the time. It does not, by itself, identify what a later Stage 2 or Stage 3 comprised or prove that either was approved or built.

PRIMARY SOURCEQueensland Government · Projects Queensland 1997–98 · Couran Cove entry at printed page 52Open source ↗

The historic scheme identified a future development area

A copy of the Couran Cove mixed-use development scheme appears inside a 2020 public submission to the Australian Energy Regulator. Its Schedule 2 identifies a “Couran Cove Future Development Area”, shown on the mixed-use development plan, and says that area would be the subject of future applications under the Act. The reproduced text describes the primary intended development as accommodation buildings.

This is important context, but it is not proof of a currently active approval. The document is a copy included by a submitter in a later regulatory process; its current legal status, amendments, boundaries and subsequent approvals must be checked against authoritative planning and title records.

PUBLIC REGULATOR FILEAustralian Energy Regulator · public submission dated 30 July 2020 · historic scheme reproduced in attachmentOpen source ↗

2003: a ferry-terminal proposal was a different development issue

Queensland Parliament’s Hansard records a November 2003 speech about a proposed ferry terminal and car-parking facility on Jabiru Island. The speech said a material-change-of-use application had been lodged with Gold Coast City Council and described local opposition and a provisional committee decision.

That mainland transport proposal should not be relabelled “Stage 3” without evidence linking the terms.

PRIMARY SOURCEQueensland Parliament Hansard · 26 November 2003 · printed pages 5252–5253Open source ↗

Have a reference—not a rumour?

Email the application number, document title or public link to ops@southstradbroke.co. Do not email confidential owner records or personal information. Submissions are checked and never publish automatically.

Corrections and right of reply

This article distinguishes source facts from our interpretation. A factual correction should identify the sentence, supporting primary source and requested change. Material corrections will be dated. Advertising does not control this investigation.